Gautrain construction update – Train Depot complete

By PDADCO payday loans

Sunday, 14 Jun 2009 04:29
This centre will be the heartbeat of Gautrain from where signalling, telecommunications, automatic fare collection, traction power and overhead distribution CCTV cameras and maintenance will be managed using world-class, high technology systems.

The train maintenance workshops and the other Depot facilities, including the washing bay for cleaning of the trains and a sand-filling facility, are also complete and operational. The trains are equipped with a sand dispensing mechanism, which deposits a special type of sand onto the rails to improve traction between the wheels and the rail when necessary.
INSTALLATION OF COMPUTERS AT THE OCC (OPERATIONS CONTROL CENTRE) AT THE DEPOT
At the Train Depot, Gautrain’s 24 train sets will be maintained, serviced cleaned, and securely stabled overnight.

The Gautrain Rapid Rail Link is a state-of-the-art rapid rail network planned in Gauteng. The rail connection comprises of two links, namely a link between Tshwane (Pretoria) and Johannesburg and a link between OR Tambo International Airport and Sandton.


Sign in with a social network:

Archive